How to connect the internal and external magnetic rotor of the stainless steel magnetic pump
The inner magnetic rotor surface clean, with a long bolt is screwed into the connecting frame flange, to spin out the high flange plane around 100mm, confirm the assembly direction, put the middle frame pad, the inner magnetic rotor in the isolation sleeve, pay attention to magnetic suction, accidentally injured finger and damaged parts, the long end of the bolt in the flat countersink hole, uniform rotation of two long bolts, inner magnetic rotor into the isolation sleeve, note two bolt drop height should be consistent. After closing, take down the long bolt and tighten the bolts connecting the pump cover and the connecting frame, and the inner and outer magnetic rotors are closed. Health level self-priming pump
- Close This Page
- Recommendation:
- Browse: