When the pump fittings are assembled, what order should be done in accordance with the pump fittings? Today, I would like to make a detailed introduction to all of us.
1. the sealing ring is tightly packed in the inlet and middle section.
2. set the guide wing on the guide wing and then put the guide wing on all the middle sections.
3., install the shaft of the axle sleeve and the key shaft through the intake section and push the impeller. Lay a layer of paper pad on the middle section, install the middle section, and then push into second impeller, repeat the above steps, and install all the impeller and the middle part.
4. the balance ring, the balance sleeve and the guide wing of the effluent section are installed on the effluent section respectively.
5. the outlet section is installed in the middle section, and then the inlet, middle and outlet sections are fastened with the tightening bolt.
6. installed balance plate and bushing B. Sanitary self-priming pump
7. put the paper pad on the tail cover, put the tail cap on the effluent section, and load the packing and packing ring and the packing gland downstream into the filling chamber of the inlet and tail cover.
8. the bearing body is mounted on the inlet and rear cover respectively, and fastened with a bolt.
9. load the bearing position sleeve, ball bearing and fasten with nut.
10. in the bearing body into the butter, and the paper pallet deposit on the bearing cover and the bearing cap is installed in the bearing body by screws for.
The coupling member 11. is arranged, and all four plug vent air cock. Disassembly is carried out in the opposite direction above.