The installation of self-priming sewage pump should meet the

The installation of self - priming sewage pump should meet the following requirements:

1. When the installation foundation is set up, the installation foundation of the pump should be flat so that the plane of the flange is perpendicular to the ground.

2, when the pipeline is installed, the inlet and outlet pipe should have its own supporting frame, and the pump should not be used as the support of the pipe, so as to avoid the excessive pressure to break the flange.

3. When used outdoors, the rain cover should be fortified on the pump group.

Self priming sewage pump

4, the outlet of the pump should be installed the pressure gauge and gate valve, and the import shall be determined by the use of the pump.

5, the height of the installation of the pump, the length of the pipeline, the diameter and the velocity of the pump should be in accordance with the calculation results. The long distance transportation should take the larger pipe diameter so as to reduce the loss.

6, when the use of the pump, such as the import of a larger pressure head, should consider the pressure capacity of the pump body, when necessary, the pressure can be used to make a larger material of the material made of the pump.